QuoteJury › Cost guide › Level 2 EV charger installation › Florida

How much does Level 2 EV charger installation cost in Florida?

Updated September 2026 · Florida price index 0.93 for electrical work (national = 1.00)

In Florida, a licensed electrician typically charges $500 to $2,800 to install a Level 2 EV charger (labor for a typical run), with most jobs landing near $910. That is about 7% below the national average of $540–$3,000, based on what electricians earn in Florida.

Low end
$500
Most jobs
$910
High end
$2,800
Got a quote for this in Florida? Check if it's fair — free

AI-powered second opinion using these same Florida figures. No account, no card. Need someone to do the work? Verified pros in Florida took the Fair Price Pledge.

What a Florida quote means

Quote for this jobWhat it means
Under $300Suspiciously low — ask what is excluded, and check licensing and insurance
$300 – $3,080Fair price — inside the typical range (up to 10% over the top is still normal)
$3,080 – $4,900Running high — get the quote itemized, and get a second one
Over $4,900Ripoff territory — more than 1.75× the high end of the typical range

Same rules the QuoteJury checker uses on every quote.

What you're paying for

What is usually included: A 40–60 amp circuit from the panel to the garage, a NEMA 14-50 outlet or hardwired connection, permit, and mounting the charger. The charger unit itself is often bought separately.

What moves the price:

Distance from panel to parking spot, 40-60A circuit and wire gauge, hardwired vs. NEMA 14-50 outlet, and whether the panel needs an upgrade.

Level 2 EV charger installation cost across Florida

Typical range by metro and rural area, from BLS wage data for electricians in each area.

AreaTypical rangeMost jobs
Cape Coral-Fort Myers, FL$500 – $2,800$910
Crestview-Fort Walton Beach-Destin, FL$500 – $2,800$900
Deltona-Daytona Beach-Ormond Beach, FL$460 – $2,550$820
Gainesville, FL$490 – $2,750$890
Homosassa Springs, FL$450 – $2,500$810
Jacksonville, FL$510 – $2,850$920
Lakeland-Winter Haven, FL$490 – $2,700$880
Miami-Fort Lauderdale-West Palm Beach, FL$510 – $2,850$920
Naples-Marco Island, FL$520 – $2,850$930
North Port-Bradenton-Sarasota, FL$480 – $2,650$860
Ocala, FL$450 – $2,500$810
Orlando-Kissimmee-Sanford, FL$470 – $2,600$840
Palm Bay-Melbourne-Titusville, FL$510 – $2,850$920
Panama City-Panama City Beach, FL$480 – $2,650$850
Pensacola-Ferry Pass-Brent, FL$470 – $2,600$840
Port St. Lucie, FL$510 – $2,800$910
Punta Gorda, FL$500 – $2,800$900
Sebastian-Vero Beach-West Vero Corridor, FL$490 – $2,700$880
Sebring, FL$440 – $2,450$790
Tallahassee, FL$490 – $2,700$870
Tampa-St. Petersburg-Clearwater, FL$510 – $2,800$910
Wildwood-The Villages, FL$480 – $2,650$860
North Florida nonmetropolitan area$500 – $2,800$910
South Florida nonmetropolitan area$500 – $2,800$900

Frequently asked

Is $910 a fair price for Level 2 EV charger installation in Florida?

Yes. $910 is right around what most homeowners in Florida pay. Anything from $300 to $3,080 is inside the normal range for a licensed electrician; above $3,080 it is worth getting a second quote.

Why do quotes for the same job vary so much?

Run length and routing; long runs to a detached garage can double the price. Panel capacity — a load calculation may require a load-management device or a panel upgrade. Company overhead matters too: a large company with trucks, dispatchers and a warranty department charges more than a one-person shop, and both can be honest prices.

When should I get a second quote?

Any time a quote lands above $3,080, or when the contractor cannot break it into parts, labor and fees. Ask for the itemized version, ask what would change the price, and confirm licensing and insurance. You can also paste the quote into the free QuoteJury checker for an instant second opinion.

Other electrical jobs in Florida

Level 2 EV charger installation in other states

Sources

About these numbers. Ranges are typical market rates for a licensed, insured contractor, blended from published U.S. cost guides and adjusted with U.S. Bureau of Labor Statistics wage data (OEWS, May 2025) for each state and metro area. They are estimates, not a bid, appraisal or inspection. Real prices move with parts, access, permits and code requirements. The quote checker is AI-powered and labeled as such.